McCollough-Unis was built in 2004 on 12 acres.
Under the 2026 transformational bond, McCollough-Unis would be completely remodeled. Estimated cost: $34,843,565. Students from Oakman Elementary would also be moved to McCollough-Unis. See the one-page McCollough-Unis flyer for highlights.
Phase 4 (Years 15 to 20)
- Major renovations to classrooms, media center, gym, and pool
- Cafeteria and kitchen upgrades
- Site improvements including parking and outdoor spaces
- Athletics including turf field and walking track
- Major mechanical replacement
- Building enclosure including roofing, windows, and doors
- Major electrical replacement
- Major plumbing replacement
- Elevator replacement
About PK-8 schools
Creating preschool through eighth grade buildings will allow students and families to form strong bonds while remaining in their neighborhood school for much longer. Elementary and middle school students would be separated for classes, meals, recess, lineup, and dismissal, but all students could use special spaces like STEM labs, music rooms, and gymnasium-auditoriums. An ADA accessible pool would also be included and a turf athletic field.
Students and families would benefit from staying in the same neighborhood school for up to 10 years – from free GSRP preschool through eighth grade.
Learn more about the 2026 transformational bond on the district website.


